Access keys:

Documents > BACKGROUND DOCUMENTS

BACKGROUND DOCUMENTS

Please click here for the Draft Existing Conditions Analysis Report that is available for public review. 

Downtown Napa Specific Plan documents will be added here as they are created.

Background resources related to the Downtown Napa Specific Plan can be found on the City’s website. These documents include the following:

Note: Following content is the copy of the City of Napa Planning Division Library page. You can access the page directly on the City Website by following the link below.

City of Napa Planning Division Library of Documents PDF Print E-mail

The Planning Division provides the documents below in PDF format.  Forms and applications can be found at the Planning Division's Forms & Applications webpage.

General Documents
   
Activity List of Current Planning Projects Post-Construction Stormwater Pollution Prevention Design Standards
Traffic Level of Service Guidelines
CEQA Procedures
Planning Commission Annual Report (2003)
Traffic Study Guidelines (May 12, 2005)
Certificate of Appropriateness Review
Residential Design Guidelines (November 2004)
Upper Water Zone Map
Liveable Local Residential Streets and Connectivity (Sept. 8, 2005) Significant Trees List
 
 
 
General Plan Cultural Heritage / Historic Fees and Initial Deposits
General Plan Envision 2020 Cultural Heritage Commission Annual Report (2003) Fees and Initial Deposits
Housing Element Historic Resources Inventory List Estimated Fees for Example Residential Development
  Landmark Designations List Estimated Fees for Example Commercial Development
     
NEIGHBORHOODS, PLANNING AREAS, AND PROJECTS
Big Ranch Road
Soscol Gateway
Stanly Ranch Specific Plan EIR (1998)
Big Ranch Road Specific Plan
Soscol Area Final Drainage Report Cover (Jully 2005)
Draft EIR
  Soscol Area Final Drainage Report (July 2005)
 Chapter 1 - 3
Downtown
Soscol Committee Meeting Summaries
 Chapter 4 (A - B)
City of Napa Parking System
Soscol Corridor Downtown Riverfront Development and Design Guidelines
 Chapter 4 (C - E)
Downtown Napa Mixed Use and Infill Residential Development Strategy
Soscol Financial Feasibility Analysis
 Chapter 4 (F - H)
Downtown Riverfront Urban Design Plan Part 1
Soscol Gateway Implementation Plan Final Traffic Report (August 2005)
 Chapter 4 (I - N)
Downtown Riverfront Urban Design Plan Part 2
Soscol Gateway Implementation Plan Needs Analysis Report #3 (revised October 2005)
 Chapter 5 - 7
  Soscol Gateway Implmentation Plan Needs Analysis Report #3
Final EIR
Napa Abajo-Fuller Park District
Soscol Gateway Implementation Plan Recommendations
 Chapter 1 - 3
Design Guidelines for the Napa Abajo-Fuller Park Historic District
Soscol Gateway Implementation Plan Report #1 Infrastructure Needs Analysis - Public Utilities
 Chapter 4 - 5 and Appendix
  Soscol Gateway Potential Infrastructure Improvements Funding Needs Report #2 Street Connections
Exhibit A and Resolution
Napa Valley Corporate Park
Soscol Gateway Vision
Negative Declaration
Napa Valley Corporate Park Design Guidelines
Soscol Transit Center
Resolutions
     
  Miscellaneous Tannery Bend
  City of Napa Agreement for Services
Tannery Bend Guidelines